How do I choose an ADU builder in San Diego?
Check the contractor’s license, insurance and bonding, relevant project examples, and references. Ask who handles design, engineering, permit revisions, construction, and inspections. Compare written scopes, allowances, exclusions, change-order terms, and warranty coverage rather than headline prices.
Can my property support an ADU?
Start with the property address and governing jurisdiction. Feasibility includes the existing legal dwelling, zoning, easements, setbacks, access, utilities or septic capacity, and coastal, fire, historic, or HOA constraints. Lars coordinates this review; the responsible agency decides eligibility and approval.
Do I need to hire a separate ADU architect?
Lars coordinates architecture, design, engineering when required, permit documents, and construction through its design-build process. The professionals and drawings needed depend on the project. Discuss responsibility for each service and any existing plans during the initial consultation.
How much does a garage conversion ADU cost with Lars?
Lars’s full design-build garage-conversion planning range is $150,000–$225,000+. This is not a fixed quote or a ceiling. Slab and structural condition, utility upgrades, access, design, and selections affect the scope. A project-specific estimate should identify inclusions, allowances, fees, and exclusions.
How long does an ADU take to design, permit, and build?
The schedule includes feasibility and design, application preparation, agency review and revisions, then construction and inspections. A statutory decision period for a complete eligible application is not the total time from first design to a permit or move-in. Lars develops the project schedule around the actual scope, approvals, utility coordination, and selections.
Who handles ADU permits and inspections?
Lars coordinates permit documents, submittals, agency comments, plan revisions, and construction inspections within the agreed scope. Owner signatures and agency or utility fees may still be required. The reviewing agency retains authority over approvals and inspection sign-offs.
Which is better for my property: a detached, attached, or conversion ADU?
A detached ADU provides physical separation, an attached unit connects to the main home, and a conversion reuses existing space. Compare privacy, access, structural condition, utilities, budget, and intended use. A unit above a garage requires a different structural approach from converting the garage itself.
Do I have to live on the property with an ADU or JADU?
State law generally does not allow local owner-occupancy requirements for ADUs. For JADUs, owner occupancy is not required when the unit has independent sanitation facilities. When a JADU shares sanitation with the main home, the owner generally must live in the main home or JADU, subject to statutory exceptions. Confirm the arrangement and current rules for the property.
Can I rent out an ADU or JADU?
Plan for long-term use and confirm the applicable rules before relying on rental income. The City of San Diego requires ADU rentals longer than 30 days; state law requires JADU rentals longer than 30 days. Rent depends on location, size, privacy, amenities, and market conditions and is not guaranteed.
How does an HOA affect an ADU project?
California law limits HOA restrictions that prohibit or unreasonably restrict qualifying ADUs and JADUs. Reasonable conditions may still apply. Review the property’s governing documents early and coordinate required review alongside design and permitting.
Can I customize the floor plan for family or multigenerational living?
Yes. Plan the layout, separate entry, kitchen, bathroom, storage, sound control, and accessibility around how the household will use the unit. The design still needs to fit the property, approved building envelope, structural and utility conditions, and budget.